MONITORING OF SECONDARY CIRCUIT PARAMETERS OF CURRENT TRANSFORMERS OF ELECTRICAL POWER OBJECT CONTROL SYSTEMS

Authors

  • B. S. Stohnii Institute of Electrodynamics of the National Academy of Sciences of Ukraine
  • M. F. Sopel Institute of Electrodynamics of the National Academy of Sciences of Ukraine
  • Ye. M. Tankevych Institute of Electrodynamics of the National Academy of Sciences of Ukraine
  • H. M. Varskyi Institute of Electrodynamics of the National Academy of Sciences of Ukraine
  • I. V. Yakovlieva Institute of Electrodynamics of the National Academy of Sciences of Ukraine

Keywords:

current transformer, monitoring system, parameters of secondary circuit

Abstract

Current high-potential transformers as installation of monitoring are observed, factors which influence availability index of product of the transformer are defined. Necessity of the continuous control of parameters of their secondary circuits is shown. The structure of system of monitoring of parameters of secondary circuits of current transformers is offered, demands to entry converters of a current and voltage for such systems are defined.

Author Biographies

B. S. Stohnii, Institute of Electrodynamics of the National Academy of Sciences of Ukraine

Academician of NAS of Ukraine, Dr. Sc. (Eng), Professor, Head of the Department of Electrical Systems Automation

M. F. Sopel, Institute of Electrodynamics of the National Academy of Sciences of Ukraine

Cand. Sc. (Eng.), Senior Research Assistant, Leading Staff Scientist of the Department of Electrical Systems Automation

Ye. M. Tankevych, Institute of Electrodynamics of the National Academy of Sciences of Ukraine

Dr. Sc. (Eng.), Senior Research Assistant, Leading Staff Scientist of the Department of Electrical Systems Automation

H. M. Varskyi, Institute of Electrodynamics of the National Academy of Sciences of Ukraine

Cand. Sc. (Eng.), Senior Staff Scientist of the Department of Electrical Systems Automation

I. V. Yakovlieva, Institute of Electrodynamics of the National Academy of Sciences of Ukraine

Cand. Sc. (Eng.), Senior Research Assistant, Senior Staff Scientist of the Department of Electrical Systems Automation

References

1. Московский блэкаут. Кто виноват и что делать? [Електронний ресурс]. — Режим доступу : http://www.nkj.ru/archive/articles/6345/.
2. Аппаратно-программный комплекс непрерывного диагностирования основной изоляции трансформаторов тока и высоковольтных вводов силовых трансформаторов / Б. С. Стогний, Ю. В. Пилипенко, М. Ф. Сопель, В. Л. Тутик // Праці Інституту електродинаміки НАН України : зб. наук. пр.. — 2010. — Вип. 26. — С. 38—46.
3. Бажанов С. А. Маслонаполненные трансформаторы тока / С. А. Бажанов — Москва. : Энергоатомиздат, 1983. — 80 с.
4. Варский Г. М. Влияние межобмоточной емкости на точность работы высоковольтного трансформатора тока // Технічна електродинаміка. — 2014. — № 4. — С. 58—60.
5. Система збору та обробки інформації, що реєструється комплексами «Регіна-Ч» / [Б. С. Стогній, О. В. Кириленко, О. Ф. Буткевич та ін.] // Праці Інституту електродинаміки Національної академії наук України : зб. наук. пр. — 2011. — Вип 29. — С. 35—46. — Бібліогр. : 12 назв. — укр.

Downloads

Abstract views: 132

Published

2016-02-01

How to Cite

[1]
B. S. Stohnii, M. F. Sopel, Y. M. Tankevych, H. M. Varskyi, and I. V. Yakovlieva, “MONITORING OF SECONDARY CIRCUIT PARAMETERS OF CURRENT TRANSFORMERS OF ELECTRICAL POWER OBJECT CONTROL SYSTEMS”, Вісник ВПІ, no. 6, pp. 57–62, Feb. 2016.

Issue

Section

Energy generation and electrical engineering

Metrics

Downloads

Download data is not yet available.